Showing posts with label Crumb Quilts. Show all posts
Showing posts with label Crumb Quilts. Show all posts

Wednesday, September 30, 2020

September Wrap up: The End of National Sewing Month and Mini Madness

September was National Sewing Month and for me it was a month for a bunch of mini quilt finishes!


"Lidia"

First up is a project in my continuing obsession with Edyta Sitar's Laundry Basket Quilts designs!  I learned about her mini log cabin quilt design when I saw one of her "Quilting Window" videos on You Tube.  She also offers it as a stand alone pattern and in her book "Little Handfuls of Scraps".   

I started piecing the blocks for it at the end of  July and the fabric for the block "logs" came straight out of the crumb bins.  The blocks were only two inches finished and the logs started out at 3/4".  I probably needed to block the quilt top when I finished it so the borders are a little wonky.  It didn't help that in order for it to fit the space I want to hang it, I had to make my borders smaller than patterned.  I fussy cut them from the stripe fabric pictured.  Making it with larger borders might have helped me square it up a bit more.  

What was cool was that I found a quilting motif for it in an unusual place. 


 A couple of weeks ago, I read a post by Rebecca on her Cheeky Cognoscenti blog about how she had received a bunch of old Quilters Newsletter Magazine issues from a guild member cleaning out her studio.  She had even found a solution to a piecing problem she was having in one of them.  I commented that I still love my QNM issues even though the magazine ceased publication back in 2016.  I have an almost complete collection of them and often find new things of interest or education when I thumb through them.  

It just so happens that the same week I finished the top for this project, I had received an old QNM back issue that I didn't have and found for sale on eBay.  It was a case of perfect timing since the issue from July 1976 (!) had the perfect quilt design for this little mini quilt!  Even better, all the gentle curves in the design meant it could be executed with a walking foot.  The only issue was how to mark it?  I took the "Golden Threads" paper template route although I used regular wrapping tissue paper to make my templates.


This project was another fun little Laundry Basket Quilts diversion and I look forward to getting it hung up and displayed. 


"Gertie"

 Next up is my micro-mini version of one of Carrie Nelson's Schnibble quilt designs. 


The original quilt is lap-sized and made from charm squares.  Mine is another mini pieced from the crumb bin starting at the end of  July.  This time I used 1" starting strips and scrap triangles (save those cut offs!).  Working so small, it was a bit of a challenge to sew together and I had to press the seams of the triangle squares and all the rows open.  That allowed it all to lay flatter given the tight confines of the seam allowances after the blocks and rows were stitched together. 

Ironically it was only after I had finished the top that I happened to read a blog post by Janet of the Rogue Quilter blog who is a phenomenal mini quilt maker.  Back in 2016 she made a mini quilt by using 1/2" finished gridded fusible interfacing.  If I had thought of that, it would have saved me a ton of effort!  And wouldn't you know it, I already have some here.  Hmmm, guess that means I have to do another one of these, you know for scientific testing purposes, you understand!  

This one was also quilted with a walking foot, this time using the freezer paper template techniques from Mary Mashuta's "Foolproof Walking Foot Quilting Designs" book.  I used the same technique last year on a baby quilt I made for a relative. 


The "binding" on this one was the backing turned to the front using a tool:  



"All In A Days Work"

Back in June, I had set up some hand work projects to work on while recovering from surgery.  I had started a wool piece that's been a "Hussy" (HSY = Haven't Started Yet) project for years.  

Well now it is finished:   The original penny rug pattern by Wooden Spool Designs was designed to finish about 16 inches in diameter.  For my project, I reduced that to 9 inches so it could be used as the header for a holder for my shopping list pads.  

Back in 2015 (which lets you know just how long this HSY has been hanging around!), I saw a similar penny rug design by Bonnie Sullivan called "Sunflower and Chickens".  I loved her idea to have some of the eggs on the tongues have "yolks" and decided to do that with mine as well.  And don't you just love when a plan comes together:  I had the absolutely perfect fabric in my stash to back it with:

I had always planned to make this penny rug design to hang in my kitchen because I have a few other chicken themed pieces in there and have long wanted to add more.  I have an old dry erase board for the grocery lists that has seen better days and I've been trying for a while to figure out a way to replace it.  Now I have it!  I'm thrilled to get this one done and put to use!


"The Purple Pineapple Mug Rug"

Ok, last but not least:  my best friend from high school is a grandma and faced with taking on the duties of homeschooling her kindergarten grandson.  He and her daughter live with her and her daughter works two jobs.  My friend works from home so it was easier for her to take on that task. 

 As have so many other parents during the pandemic, she is forced to learn how to manage her grandson's school days while juggling her own work.  It's an adjustment for everyone, particularly since it's the first structured school experience for her grandson.  From what she tells me, what they study in Kindergarten these days is way more advanced than it was in our day! 

Since she's working so hard to meet the challenges of teaching from home, I wanted to send her a little "pick me up".  I saw these at our local supermarket and just knew she'd love it!

Well, as a quilter if you send a mug, 'ya gotta send a mug rug right?  In a recent Skype chat with another friend of ours, she mentioned she liked purple so I rummaged through the stash and pulled as many purple fabrics as I could.  But what to make?  I've made a few mug rugs featuring inspirational panels from a June Tailor kit I have and still had some left so I started there.  

The kit has patterns to use with the panels but none would allow me to use as many fabrics as I wanted to, Lol!!  So I went looking for another design that could accommodate the panel AND a generous fabric pull.  As I was reading blogs,  I read about someone making a Pineapple quilt and I thought, that just might be the ticket!  Particularly since I knew I had this:  

Very early in my quilting journey, I wanted to make a Pineapple quilt.  Back then, most were patterned to be made by paper piecing the blocks.  I did start one using that method and quickly found that to be very tedious and that project is still a UFO (but will have its day in the sun again one day).

BTW, This pattern is in the June 2000 issue of QNM.

Eventually, I found out about the Pineapple Rule by the Possibilities/Great American Quilt Factory ladies Lynda Milligan and Nancy Smith.  The sales pitch was that you could make Pineapple blocks without having to paper piece them.  When I got the ruler, I immediately made a test block.  That "orphan block" eventually became a journal cover.

Unfortunately, I haven't used that tool since -- that is until now!  Their method uses 1-1/2" strips.  Normally the block would start with a 2-1/2" square but the June Tailor panel I was using is 4-1/2" square.  No matter, that just meant less rounds of strips to sew to get to the 12" finished size!  

I kept this one simple: I only had four light fabrics so used one in each of those rounds.  I placed the medium and dark fabrics scrappy throughout the block.  Then it was a simple pillow turn finish (no binding!)  and some simple stitch in the ditch and stitching down the center of the logs and it was ready to be mailed out!


I  still have two AQS BOM blocks to finish up for September and I had another BOM project I had hoped to work on.  I guess they will instead be early October projects!

Monday, August 31, 2020

August Recap: What A Whirlwind!

In July I made my way back to the sewing machine and then in August, I amped it up a notch.  Well, maybe two notches, Lol!  So much tackled, a few things started and an important finish.  I'm hoping to approach September just a little less frenzied.

First off, my priority for the month had been to finish work on some zigzag machine applique while I still had Rhubye, my Singer 401 in the sewing machine cabinet.  I had hesitated working on the applique at the end of July because for some reason, I was under the impression that I had never done that on this machine before.  I wanted to check the stitch width and how stitched units that are layered underneath other units looked.  So  I did a scrappy test block first.... 


....and when that went fine then did the center applique for "Esther's Garden Box", a Kim Diehl "What Nots Club" pattern. 



I had purchased the "What Nots" kit to provide some extra fabrics for yet another Quarantine project I have brewing.  The good news was that I was able to get what I needed and will still be able to make up the whole kit project as well.  

With that successfully done, I then FINALLY stitched down the stars and word appliques for the "Hope" Quilt Along QOV top I finished back in June.



It was only after that I was reminded that I had actually done machine applique on this machine before!  Back in January of last year, I made a baby quilt for my DH's cousin and appliqued the child's name on it.  Yeesh!  My quilting memory must be shot because of this pandemic!  Or maybe it's just a side effect of project overload.

I was also hoping to get back on track with my BOM projects.  I  managed to bring the blocks for the Joann BOM up to date.  The Joann's were the easiest to do because they are pre-cut so made great leader/enders for other projects worked on this month.  They are now up to date through August.




I only got two of the four AQS BOM blocks I wanted to work on done.  



 In order to catch up on the AQS blocks, I need to make four blocks each for August - November to bring me back up to date.  I'm going to try to get the other two August blocks done by the end of this week and then attempt to stay on track for the rest of September. 

Die cutting the fabric scraps after making the AQS blocks, I also got a few more Spider web units for the tree skirt made up too.

But wait, there's still more!  Having done Edyta Sitar's Mystery 2020 QAL back in May, I am now officially in a Laundry Basket Quilts obsessive phase!  I am loving everything LBQ I see to the point that I have not one, not two but three projects planned using the scraps from all the blue fabrics I  purchased for the AQS project!  It would have only been two except that I saw another of her quilts that is in her book "Handful of Scraps" and wanted to add it to the Bucket List.  Just my luck,  I found someone selling a copy of that book on eBay along with Edyta's "Patches of Blue" book at a "couldn't pass it up" price.  I shouldn't have been surprised when the books arrived, to fall in love with some of the Blue and White projects in the second book.  A real problem when it's the color theme for this year's Christmas decorating and the AQS project.  So the third project got added from that book.

But it didn't stop there!  The plan is to work on all the blue and white projects through the Fall and finish up before the holidays.  However, the LBQ obsession could not be quenched and called for more immediate fulfillment.  What to make?  How about something small?  Well, I've also been dying to make a log cabin quilt.  That fire was stoked after using my Log Cabin die to cut the strips for the borders of Edyta's mystery quilt.  Then one day I came across her video for her little "Lidia" quilt.  Perfect! 


Even better,  I've been establishing a new mini quilt display space so making this would help fill it.  However, the pieces for it were so small I didn't need to use my stash of log cabin strips,  I could pull and cut what I needed from my overflowing "Crumbs" bins.  Another bonus!  


After joyously rooting around in the "Crumbs" for "Lidia", what should I see on the web but a Carrie Nelson "Schnibbles" pattern named "Gertie".  Who can resist a Schnibble?  It's  designed to use Charm packs (5" squares) for a lap quilt but I realized if I downsized it and used even more "Crumb" bits to make it, I'd get another little mini for the display space.  So this happened:


The blocks for Lidia are pieced and the border print is picked out.  My border will be smaller than Edyta's in order for it to fit the space where I want to display it.  All the HST Gertie bits are pieced and background squares cut so now I just have to sew it all together.

Edited to Add:  And you can see these two finished here.

It was at this point that  I could FINALLY swap out the 401 for a long deserved rest and swap in "Nova" the Brother 1500 mid-arm.  I thought it was going to be for trying to FINALLY  quilt one of my own projects but nope!  The pandemic curve has flattened greatly here in NY and things are opening up more and more.  So it shouldn't have been a surprise to get a call from the troop leader of the Girl Scout troop we had worked with back in December and January.  They were setting up a meeting and she wanted the quilt made from the finished blocks.  Yikes!  I had gotten the top, backing and label prepared back in March right  before we went into quarantine.  As a result, I held off doing the quilting -- or more honestly, switched my focus to mask making and all the quarantine quilt alongs and personal project inspiration that came in.

However, I was more than happy to have a motivation to move something to a finish and out of my quilt space.  So I decided on the final binding choice (picked from an assortment of fabrics that had been purchased for the EPP workshop I did in February) and got to work on that.


The backing fabric is actually 4-H fabric.

I quilted it much simpler than I originally planned.  I limited it to stitching in the ditch around the blocks and the only free-motion done was around the hearts in the fussy-cut sashing squares.  There was a lot of hand work to be done though:  Although I attached the binding completely by machine (sewn to the front and stitched in the ditch to tack it down in the back), I needed to hand stitch two 3-D applique motifs that were applied on top of the sashing and also tack down some of the motifs and trims that had been attached to the blocks so that they stay secured as the quilt is handled.  I also sewed on a hanging sleeve on the back since part of the original plans for the quilt was to make it so the troop could carry it as a banner in a parade.  

So the good news is that the straight stitch only machine now in the cabinet means I can quilt big quilts but still be able to piece things.  I'm hoping there can be a few more quilted finishes for September even as I continue to work on catching up on the BOMs and piecing some more quarantine projects.  Add to all of that two national political conventions and a couple of hurricanes and it really was a whirlwind of a month!

Thursday, March 1, 2012

Leap Day and March 1 Sewing

Thank goodness for Leap Day!  Having spent most of the month working on the donation quilts, I didn't get much time to spend on the Patchwork Times February UFO pick (#1) which for me was my Double Wedding Ring quilt. The last time I had worked on it was in the Fall of 2010.


Back then, I had started working on the layout of the center blocks but the had to put them away in favor of other projects.  When I recently pulled them out the box they were stored in, I see I didn't do a very good job of putting it away in an organized manner.  Fortunately,  I had the blog pic to guide me and I reworked the applique block placement.

I had already put pieced rings on one center and got another one done on Monday.  But then I was waylaid by an injury Monday night and Parent Teacher Conferences at DS2's middle school on Tuesday so Wednesday was the first chance I've had to get back to this.  Unfortunately hampered by the injury (to my thumb), it's hard to do any pinning so I spent all day and only got one more done:


But with the ring centers up on the wall, I am getting real excited about this one.  With limited hand mobility and all the curve pinning that needs to be done, I probably can't get much more than one done a day.  So since Judy announced the March UFO Challenge project yesterday, I've come up with a new plan.

The March project is #8 which for me is my "Bouncing Colorblocks" swap quilt that needs to be quilted.


Since I am already 0 for 2 on the UFO Challenge, my plans for March are to not only complete the quilting for the March project but to play catch up on the projects from the first two months as well.  I'd really like to go into April completely up to date.

But since "detour" has been my middle name since last year, of course I already have an adjustment to the plans:  for the next few days, I need to focus on my Crumb blocks:


Jo's last "Crumb Along" reveal day is this coming Monday.  The great thing is these blocks are being freezer paper pieced and don't need any pinning so they are perfect to work on while my thumb is out of commission.  So I'm putting my nose back to the grindstone to try to get something done for March!

Tuesday, October 11, 2011

Crumbling More Houses!

Having finally got on board the Crumb Along, I was able to add another house block today to the ones I started making this weekend:


You can read about my plans for these and how I got them started in my last post

When Jo announced the Crumb along I hadn't realized was that she was planning to do tutorials for specific (liberated) block units made of crumbs (like flying geese and stars). Today's log cabin blocks go right along with what I am doing with my houses so I hope in the coming days to make a few of those as well as some of the other units too.  While these were not originally in my house quilt plans, I am now thinking about how I can use them as border or sashing blocks or fodder for the back or label.  If all else fails, they can become orphan units for another quilt.  We'll see what develops!

Wednesday, December 29, 2010

Quilters Accountability 12/29/10

The Final Push and the Last QA Post for 2010

Last Week's Goals:
  1. Layer the Crumb quilt. Done.
  2. Quilt the Schnibble, Crumb and Brrrr! quilts. Started the Schnibble today.
  3. Finish up the Sage Sampler blocks.  Didn't touch 'em.
  4. Get back to work on the DWR top. Nope.
It's a good thing I accomplished the things I did last week, because after setting up my machine to start this week's list, I broke my new sewing machine!  I hit the plate converter with the needle (don't know how I did that) and it popped off, prompting a rush visit on Friday to the Nimble Thimble where I had purchased it so it could be sent out for service.  I was lucky it happened at the end of last week because the store is closed all this week.  Which was fine since I had promised DS2 that I would take him to purchase the skateboard he wanted for Christmas so we were able to "kill two birds with one stone" that day.  Thank goodness I still have my old machine so I am not totally stranded.

So after maiming my machine, visiting relatives on Christmas Day and prepping for friends who were going to stop by on Monday, I think I expended the last of my Holiday energy. After DH and I shopped early Sunday in anticipation of either our guests or a forcasted snowstorm, I took the rest of the day to relax. By Sunday afternoon the blizzard came in, by that evening we had cancelled the plans with our friends and by Monday morning we had no more storm and twenty inches of snow blanketing the city! New York City rarely stops even for a snow storm so you know this was a big one when most of the public transporation was not running, the airports were closed and Mayor Bloomberg was exhorting everyone to stay home and take a Snow Day.
Picture Courtesy of the NY Daily News; 12/27/10 Article 

So this is how my week started:


All the layered quilts:  The Schnibble "Scratch" top is on top (layered the week before last), Brrr Park on the left (the last of the quilt tops made and layered in 2009) and the Crumb top which I finished layering on Tuesday.  So I did not get to start quilting until today.  However, "Scratch" is small and I've got about a quarter of it done already, so the quilting may get finished tonight and the "back-turned-to-the-front" binding tomorrow.   

Goals for the Rest of the Week:  I still have tomorrow and Friday to try to finish up the other two and make the list for Finn's Year-End Challenge.  For Friday, Saturday and possibly Sunday, I plan to participate in Pat Sloan's New Year's Eve/Day UFO Busting Party (details announced today on her blog).  I am hoping to finish things for the YEC as well as get a start on some things for Myra's 2011 PHD Challenge that I signed up for (you can see what I've got on my list for that here).  My goal for next year: NO UFO's!

Hoping you enjoyed your Christmas celebrations and are planning big things for New Year's Eve and Day.   Hop on over to Bari's to see how everyone else finished up for this year.  Here's to a productive 2011!

Wednesday, December 22, 2010

Quilters Accountability 12/22/10

It was a productive week.  As usual, not as much done as one would like but enough to feel real good about what did get done.

Last Week's Goals:
  1. Do the quilting on the blue & white quilt and mail off both doll quilts. Done!
  2. Quilt the Tree Skirt (and decorate the tree purchased on Sunday!) Done!
  3. Layer the Schnibble and Crumb quilts and quilt them.  Schnibble is layered, Crumb quilt's borders are on and quilting not done yet.
  4. Start quilting the Brrr Park! quilt (already layered from last year).  Nope.
So the doll quilts are finished and were mailed off to my Aunt Monday morning.  I got a Christmas card/letter from her that afternoon saying she hadn't heard from me in a while.  So now I am really looking forward to her getting the surprise package.  It was sent Priority Mail so should reach her before the end of the week.

I finished the quilting and binding on the Tree Skirt on Sunday and decorated the tree on Monday.  I was surprised that the skirt instructions did not include ties or a way to close the opening.  But after laying it around the base of the tree I found out why -- the open ends overlap to surround the base so it doesn't need closures!  Cool!


I layered the Schnibble quilt yesterday and had hoped to also get the Crumb block top done too so that I could just quilt the next three quilts one right after the other.  But that required attaching the borders of the Crumb top.  And part of the borders meant attaching the beaded barrel trim that is serving as the inner border.  Sewing the trim on was a lot more difficult than I expected.  I basted it to the top first which (note to self and any others planning on using decorative trims on your quilt tops) would have been much easier if I had planned for a wider outside edge seam rather than the standard 1/4".  It took a lot of finessing to get it in place yesterday so I had to wait until today to attach the outer border which again, due to the narrow seam and the thickness of the trim, took some finessing to get on.  But it is done and since it will be quilted simply (stitch in the ditch around the Crumb blocks and do some kind of decorative stitch in the sashing squares to give it a "tufted" look), I am hoping the layering will go fast tomorrow.



I also got a bonus project done on Friday:


This little runner was sewn up back in 2008 when I made the quilt blogged about here. It is one of three (in different styles) made from the leftover fabric from the quilt.   It is a Karen Montgomery design that I picked up from the Timeless Treasures fabric company website when I made the quilt (and can be seen in full here but is no longer offered for free and can be purchased here).  The fusible Hobbs batting used for the Gathering Garden quilt and the tree skirt had left me with just enough batting to layer this.  This is another "pillow turn"  project that I knew would be simple to quilt because the lines of the stripe provided all the quilting guidance I needed.  Nothing fancy here, just stitching with smoke monofilament thread around each stripe border and between the little sawtooth star and brown solid square motifs in the center. I had considered also edge-stitching around the outermost edge until I realized that after stitching to the right of the red fabric of the stripe that circled the edge, it looked just like a traditional binding so with that faux finish, it was done!  I am only considering this a bonus project (not a UFO finish) because I don't plan to sew up the other two until after the New Year.

This Week's Goals:
  1. Layer the Crumb quilt.
  2. Quilt the Schnibble, Crumb and Brrrr! quilts.
  3. Finish up the Sage Sampler blocks.
  4. Get back to work on the DWR top. 
So go check in with Bari and see what everyone else has planned as we make the final descent to the end of the year.


Wednesday, May 26, 2010

Quilters Accountability 5/26/10

Well, it's the final week of the Spring Finish!!!  Time to get those last few projects done for reporting on Monday.  The good news is that I am thisclose to another finish and hope to get at least one more done before deadline. 

Last week's goals:

1.  Finish the quilting and bind the Charming Log Cabin quilt.  Almost done.  The quilting in the center is finished.  Unfortunately I couldn't get great shots of it.  Hopefully when the quilt is completely finished I can get some better ones.



The top and bottom borders (with the squiggly "Princess Woo" fabric) are grid quilted and will then have a (traditional) scallop edge cut into (out of?) it before binding.  I will finish the grid quilting on the bottom edge tonight.  Even though it's simple to do, it is a bit tedious and therefore time consuming. I still have to decide on the binding (it will probably be the blue stripe on the bias) so I'm not expecting to tackle that until tomorrow or Friday.



2.  Layer and quilt the Dino Sports2 quilt for charity donation.  Didn't get to this one but......

This week's goals:
  1. Quilt last border of Charming Log Cabin quilt, bind.
  2. Layer and baste Dino Sports 2 quilt, quilt, bind and make a pillowcase.
  3. Add border trim and outer borders of Paisley Crumb quilt, layer to backing, quilt and bind.



The Dino Sports 2 quilt and  pillowcase (on the left) will be donated to the Basics Quilt Gather (click the button on the sidebar for details) charity drive when completed.  I am expecting it to be quick to quilt since I'm not planning to do anything fancy with the stitching or finishing.  I decided to throw the Crumb quilt into the mix this week as well.  It too would be simple to finish because the blocks will only be outline stitched.  If I can get these two done (whether by the Spring Finish deadline or after), I will only have one flimsy from 2009 still left to quilt and that means I will feel alot less guilty when I start some new projects!

While I put my nose back to the grindstone, you can head over to Bari's to see what everyone else got done this week. 
Posted by Picasa